Genchi Genbutsu (現地現物)

Genba (現場)

3 Mu: Muda, Mura, Muri

30-second rule

5S-Methode

Andon

CT

FIFO: First time in- First Time out

Genba

Heijunka

HT: Hand time

Jidoka

JIT: Just in Time

Kaizen

Kanban

Lot

Mass production

MRP: Materials Requirements Planning

MT: Machine time

Muda

Mura

Muri

NVA: Not value Added

OEE: Overall Equipment Effectivness

OJT: On the job training

One piece flow

PDCA: Plan, Do, Check, Act

Poka-Yoke

Pull

Push

Red Tag

Seiketsu

Seiri

Seiso

Seiton

Setup

Shadow board

Shitsuke

SMED: Single Minute Exchange of

Standard work

TT: Takt Time

TPM: Total Productive Maintenance

U cellaVA: Value Added.

VSM: Value Stream Map

WIP: Work in Process

WT: Walking time